I don’t know if someone has already mentioned this, but the text for transferring runes in GM core (pg 225) still says that crafting an item takes 4 days. “It takes 1 day (instead of the 4 days usually needed to Craft) to transfer a rune or swap a pair of runs”.
This needs to be updated to say the 2 days usually needed at the very least, though I am wondering if the 1 day may be shortened as well to keep the 1/4 time required ratio from the original rules.